Tour of the WindWise turbine in Lienen
Yesterday, Monday, July 7, 2025, we were in Lienen and had the opportunity to tour a WindWise pilot turbine in Lienen, North Rhine-Westphalia. It was an exciting opportunity to get a closer look at the so-called low-wind turbine. The prototype of the Maxcap 141 model is – as the name suggests – designed for lighter winds and reaches its optimum earlier than regular wind turbines, resulting in more full-load hours and making the turbine optimized for base load. This should also significantly increase the durability of the turbine. The rated output of 2.5 MW is already achieved at wind speeds of around 7.5 m/s. This promotes more consistent power generation but prevents the utilization of strong winds. An interesting concept! Furthermore, it was simply impressive to see the wind turbine from the inside, and the view from the roof of the nacelle was simply unique; the long climb was worth it! Many thanks to @windwise.eu for allowing us to visit the facility!